Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    CFTC sets Dec. 15 talks on 24/7 trading and tokenization

    November 17, 2026

    Coinbase brings Morpho-backed loans to all 50 US states

    November 17, 2026

    Monument Bank launches Midnight deposits with £250M target

    November 17, 2026
    Facebook X (Twitter) Instagram
    Block Buzz News
    • Bitcoin
    • Coinbase
      • Litecoin
      • Altcoins
    • Blockchain
    • Crypto
    • Ethereum
    • Lithosphere News Releases
    Facebook X (Twitter) Instagram YouTube
    Block Buzz News
    Home » Gray Glacier Upgrade Announcement | Ethereum Foundation Blog
    Ethereum

    Gray Glacier Upgrade Announcement | Ethereum Foundation Blog

    Sophia BrownBy Sophia BrownOctober 14, 2026No Comments3 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email



    The Ethereum network will be undergoing a scheduled network upgrade at block 15,050,000, which is expected to occur on Wednesday, June 29, 2022. The exact date is subject to change due to variable block times and time zones. Please upgrade your node before Monday, June 27, 2022 to account for variable block times.

    What is Gray Glacier?

    The Gray Glacier network upgrade changes the parameters of the Ice Age/Difficulty Bomb, pushing it back by 700,000 blocks, or roughly 100 days. This has also been done in the Byzantium, Constantinople, Muir Glacier, London and Arrow Glacier network upgrades. No other changes are introduced as part of Gray Glacier.

    With Ropsten now transitioned to proof-of-stake, the difficulty bomb only affects the Ethereum mainnet. This means Gray Glacier will not be deployed on any testnet.

    Client Versions

    In order to be compatible with the Gray Glacier upgrade, node operators will need to update the client version that they run to one of the ones listed below:

    Upgrade Specification and EIPs

    The full specification for the upgrade can be found in the execution-specs repository under gray-glacier.md.

    A single EIP is included in the upgrade: EIP-5133: Delaying Difficulty Bomb to Mid September 2022.

    As an Ethereum user or ether holder is there anything I need to do?

    If you use an exchange, a web wallet service, a mobile wallet service, or a hardware wallet you do not need to do anything unless you are informed to take additional steps by your exchange or wallet service.

    As a node operator or miner, what do I need to do?

    Download the latest version of your Ethereum client, as listed in the table above.

    What happens if I am a miner or node operator and I do not participate in the upgrade?

    If you are using an Ethereum client that is not updated to the latest version (listed above), your client will sync to the pre-fork blockchain once the upgrade occurs. You will be stuck on an incompatible chain following the old rules and you will be unable to send Ether or operate on the post-upgrade Ethereum network.

    What is a network upgrade in Ethereum-land?

    A network upgrade is a change to the underlying Ethereum protocol, creating new rules to improve the system. The decentralized nature of blockchain systems makes a network upgrade more difficult. Network upgrades in a blockchain require cooperation and communication with the community, as well as with the developers of the various Ethereum clients in order for the transition to go smoothly.

    What happens during a network upgrade?

    After the community comes to an agreement concerning which changes should be included in the upgrade, changes to the protocol are written into the various Ethereum clients, such as Besu, Erigon, go-ethereum and Nethermind. The protocol changes are activated at a specific block number. Any nodes that have not been upgraded to the new rule set will be abandoned on the old chain where the previous rules continue to exist.

    Why “Gray Glacier”?

    While we generally use Ethereum conference city names for execution layer network upgrades, upgrades that only delay the difficulty bomb/ice age use glacier names instead.

    Gray Glacier was chosen because it literally merges into another glacier, just like how Ethereum’s execution layer will soon be merged with the Beacon Chain!


    Thank you to Matt Palmer for the original cover image and Tomo Saito for the modifications.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Sophia Brown

    Related Posts

    EIP-8037/EIP-8038 Glamsterdam | Ethereum Foundation Blog

    November 6, 2026

    Designing for sovereignty: Ethereum for digital public infrastructure

    November 3, 2026

    Bootstrapping A Decentralized Autonomous Corporation: Part I

    November 1, 2026

    Bootstrapping An Autonomous Decentralized Corporation, Part 2: Interacting With the World

    November 1, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Top Posts

    The Ethereum Foundation’s Vision | Ethereum Foundation Blog

    September 19, 2026

    UK names six banks to lead first digital gilt issuance in early 2027

    October 6, 2026

    How to Become a Certified RWA Tokenization Professional?

    October 7, 2026

    Cardano Faces Bearish Signals as Futures Demand Cools and Whales Sell

    October 7, 2026
    Don't Miss
    Crypto

    CFTC sets Dec. 15 talks on 24/7 trading and tokenization

    By James WilsonNovember 17, 2026

    The Commodity Futures Trading Commission has published the agenda for its Dec. 15 roundtable on…

    Coinbase brings Morpho-backed loans to all 50 US states

    November 17, 2026

    Monument Bank launches Midnight deposits with £250M target

    November 17, 2026

    Hong Kong, SWIFT explore 24/7 tokenized deposit payments

    November 17, 2026
    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo

    Subscribe to Updates

    Get the latest creative news from SmartMag about art & design.

    About Us

    BlockBuzzNews: Your daily dose of the latest in cryptocurrency trends, insights, and updates!

    Our Picks

    CFTC sets Dec. 15 talks on 24/7 trading and tokenization

    November 17, 2026

    Coinbase brings Morpho-backed loans to all 50 US states

    November 17, 2026

    Monument Bank launches Midnight deposits with £250M target

    November 17, 2026
    Most Popular

    The Ethereum Foundation’s Vision | Ethereum Foundation Blog

    September 19, 2026

    UK names six banks to lead first digital gilt issuance in early 2027

    October 6, 2026

    How to Become a Certified RWA Tokenization Professional?

    October 7, 2026

    Type above and press Enter to search. Press Esc to cancel.